A look inside one of Canada’s largest extraction facilities
Adastra Labs’ approach is and always has been to develop processes with efficiency, and end-product quality in mind. Its 13,000 sq ft facility was purpose-built, with input from experienced scientists, who have advanced education and a deep passion for the plant.
Donald Dinsmore, Adastra Labs’ COO and QAP, walks you through Adastra’s facility and gives you a behind-the-scenes look at the first extraction method to be installed in the lab, Supercritical CO2. Since then the capabilities have evolved to include cryo-ethanol and hydrocarbon systems.